§ 70-101. Minimum requirements.  


Latest version.
  • All proposed new development shall be reviewed to determine that:

    (1)

    Such proposals are consistent with the need to minimize flood damage and will be reasonably safe from flooding;

    (2)

    All public utilities and facilities such as sewer, gas, electric, communications, and water systems are located and constructed to minimize or eliminate flood damage; and

    (3)

    Adequate drainage is provided to reduce exposure to flood hazards; in zones AH and AO, adequate drainage paths shall be provided to guide floodwaters around and away from proposed structures.

(Ord. No. 2017-31, § 2, 11-21-17)